Technical FAQs

Ask a Question

What are the characteristics of SR13MAE (MAE500) trip unit used in Compact NS630 circuit breaker.
The Compact NS630 fitted with the STR13MAE trip unit is named: NS630MAE500.   The old MA500 trip unit was designed with mechanical feature. The new...
Is it possible to use TeSys GV2 and TeSys GV3 Range MPCB in DC applications?
The TeSys GV2 and TeSys GV3 range MPCB can be used in DC applications as per their technical specifications. Refer the below wiring connection for...
How to connect the 4 Pole RCCB in 240V AC Single phase network.
To use the 4 Pole RCCB in 240V AC single phase network, connect the Neutral at N and Phase at terminal 1 of the RCCB.   Confirm the functionality...
How to open an excel file during runtime in Vijeo Citect.
Below cicode function can be used during runtime for opening an Excel file in Vijeo Citect:   Exec("^""+"C:\Program Files\Microsoft Office\Office11\Excel.exe"+"^"...
How to redirect control clients to specific primary and Standby servers ?
By default client established connection either to primary or standby servers, However Control clients connection can be prioritized to connect either...
what is the reference for the shorting blocks to be used to shorten the secondary of current transformers ,when not used?
You can use reference of NSYTRV62TTD in association with NSYTRASJ.Please find attached catalog page
How to mount the LA4DWB in LC1D32G7 contactor while changing(retrofit) from LC1D3210G6?
The old model Contactor is LC1D3210G6(120VAC), with relay module of LA4DWB. (E1 &E2 = 24VDC, A1 &A2 = 120VAC) and it was mounting in the top of the...
Is it possible to upgrade the trip unit for NSX breakers?
Kindly be informed that it is possible upgrade the NSX trip unit ,except for the Compact NSX with R, HB1 and HB2 breaking performances ,the trip units...
What is the difference between C.B. poles connection in series and parallel?
Please note that Series connection of poles divides the voltage per pole and optimises breaking capacity for high-voltage systems,as follows: -divide...
What is the hardware and software requirements for a Power SCADA Operation PSO 9.0 with Advanced Reporting and Dashboards system ?
The hardware and software requirements for a Power SCADA Operation PSO 9.0 with Advanced Reporting and Dashboards system can be found in document...
Results 21 - 30 of 100